Construction projects | veterans affairs

Va

Construction projects | veterans affairs"


Play all audios:

Loading...

UPDATED: WLA CONSTRUCTION ADVISORY – SFMP NORTH CAMPUS CLOSURES SOUTH OF PERSHING AVE (691-23-120) & PARKING LOT 18 DEACTIVATION TEMPORARY TWO-LANE CLOSURE (691-24-101) AREA OF IMPACT:


As a part of our continued effort to improve infrastructure across VA West Los Angeles Campus, construction crews will be performing the following work for the installation of new water


lines: Please see EXHIBIT A. A: Construction crews will close off both traffic lanes on Eisenhower Ave across B217 & B218.  Eisenhower Ave will be closed, so through traffic will need to


detour via Bonsall Ave. and Dewey Ave. Parking lots & sidewalks will remain open. TIMELINE: (WEATHER PERMITTING) Eisenhower  Construction Start:  Ongoing UPDATED: Construction Finish: 


04/28/2025 B: Construction crews will do fire & domestic water work on B506 & CTRS northeast area. Eisenhower Ave will be closed, so through traffic will need to detour via Bonsall


Ave. and Dewey Ave. Parking lots & sidewalks will remain open. TIMELINE: (WEATHER PERMITTING) Eisenhower Sidewalk Construction Start:  Ongoing UPDATED: Construction Finish:  04/11/2025 


C: Construction crews will perform fire hydrant work on Eisenhower Ave sidewalk, and the south portion of the sidewalk will be closed. Pedestrians will be rerouted to use the northern


sidewalk. TIMELINE: (WEATHER PERMITTING) Eisenhower Sidewalk UPDATED: Construction Start:  Ongoing UPDATED: Construction Finish:  04/11/2025 D: Construction crews will work on East of PL17.


  Vehicle, pedestrian traffic, and parking lots will be accessible.  TIMELINE: (WEATHER PERMITTING) East of PL17 UPDATED: Construction Start:  04/07/2025 UPDATED: Construction Finish: 


05/23/2025 E: Construction crews will work on Southeast of B114 on Eisenhower Ave.  Vehicle, pedestrian traffic, and parking lots will be accessible.  TIMELINE: (WEATHER PERMITTING)


Southeast of B114 on Eisenhower Ave UPDATED: Construction Start:  04/07/2025 UPDATED: Construction Finish:  04/25/2025 F: Construction crews will close off traffic lanes on sections of Grant


Ave West of Dewey Ave. The affected areas will be inaccessible to vehicular traffic. Sidewalks will remain open for the duration of the work.   TIMELINE: (WEATHER PERMITTING) Grant Ave West


Construction Start:  Ongoing UPDATED: Construction Finish: 04/04/2025 G: Construction crews will be working on sections of Pershing Ave & MacArthur Ave. Vehicle & pedestrian traffic


will remain open for the duration of the work.   TIMELINE: (WEATHER PERMITTING) Pershing Ave West Construction Start:  Ongoing UPDATED: Construction Finish:  04/18/2025 H: Construction


crews will be trenching across Pershing Ave by B117. One traffic lane will remain open at all times.  TIMELINE: (WEATHER PERMITTING) Pershing Ave West Construction Start:  Ongoing UPDATED: 


Construction Finish:  04/18/2025 I: Construction crews will close both lanes on portion of Grant Ave. Eisenhower Ave will also be closed, with through traffic detoured via Bonsall and


Pershing Ave. Parking lots, B214’s emergency entrance, and pedestrian access, as well as emergency and food delivery entrances, will remain open throughout the work. TIMELINE: (WEATHER


PERMITTING) Grant Ave  UPDATED: Construction Start:  04/07/2025 UPDATED: Construction Finish:  05/31/2025 J: Construction crews will be trenching across Dewey Ave by B212. Construction crews


will close off both traffic lanes on Dewey.   TIMELINE: (WEATHER PERMITTING) Dewey Ave   UPDATED: Construction Start:  04/07/2025 UPDATED: Construction Finish:  04/11/2025 CONTACT(S) If you


have additional questions about this matter or require more information, please contact: COR: Homa Shahpasandzadeh Email: [email protected]  Phone:  COR:   Gustavo Calleros Email:


  [email protected] Phone: EXHIBIT A


Trending News

Tolvaptan increases serum sodium concentrations in hyponatremic patients

Access through your institution Buy or subscribe Schrier RW _ et al_. (2006) Tolvaptan, a selective oral vasopressin V2-...

Page Not Found | Snopes.com

404 No one said finding the truth would be easy.But don’t give up! The answers could be right here...

https://www.journaldemontreal.com/2025/03/10/la-majorite-des-quebecois-vises-par-une-tentative-de-fraude-bancaire 2025-03-11T14:03:02-04:00 https://ww

https://www.journaldemontreal.com/2025/03/10/la-majorite-des-quebecois-vises-par-une-tentative-de-fraude-bancaire 2025-0...

The deskless teacher (opinion)

Being anal retentive may not win you friends, but it sure pays off in the classroom where you’re doomed if you’re disorg...

Us-china to hold human rights talks next week

The talks will take place on April 27 and 28 in Washington, and will include discussions on detentions, arrests and free...

Latests News

Construction projects | veterans affairs

UPDATED: WLA CONSTRUCTION ADVISORY – SFMP NORTH CAMPUS CLOSURES SOUTH OF PERSHING AVE (691-23-120) & PARKING LOT 18 ...

How americans sacrificed during world war ii

Jack Sullivan / Alamy Stock Photo En español | Faced with the coronavirus, Americans have been asked to remain inside ou...

Reflections on women's aging journey: a 2025 aarp mirror/mirror study on authenticity and menopause

Drawing from lived experience and wisdom, as women age, they grow into their authentic selves. This journey of growth is...

404 - Page not found

Skip to main contentGet appSubscribeVideoPodcastLong FormSubscriber Only#FightToBreatheExplainersहिन्दीSubscribeNL SenaM...

Michelin-starred restaurants in paris, our best addresses

For a special occasion or simply to treat yourself, discover the best Michelin-starred restaurants in Paris, tried and t...

Top