Documents show major gaps in texas gas inspections

Eenews

Documents show major gaps in texas gas inspections"


Play all audios:

Loading...

Oil and gas regulators are assuring Texans the natural gas system will keep functioning this winter, saying they’ve done more than 3,000 inspections to check on it. What they’re not saying


is many of those inspections found that gas production and transmission facilities can’t guarantee they’re prepared for another hard freeze. For about 40 percent of the pipeline and storage


sites Texas deems critical, operators hadn’t conducted a winterization test or company officials didn’t know if one had been performed, according to records from the state Railroad


Commission obtained under a Public Information Act request. State inspectors also didn’t actually visit dozens of sites because of “time constraints,” the records show. Advertisement One


gas-fired plant was forced to shut down a month after state inspectors said its supply pipelines had passed an inspection, records show. In other cases, inspectors appear to have overlooked


important information. Critics said there’s an underlying problem — the Railroad Commission has yet to write winterization standards for gas wells, pipelines and storage facilities. The lack


of clear guidelines makes it hard to judge the effectiveness of the commission’s inspection campaign, said Luke Metzger, executive director of Environment Texas. “I worry that might be more


of a public relations stunt than a credible regulatory effort,” Metzger said in an interview. The Railroad Commission, which despite its name oversees the state’s gas system, said the


inspection records are just a snapshot of conditions, and that companies have made progress since the reports were filed. “In the fall, some of the sites had yet to finish winterizing or


test winterization because they were coming off summer operations,” Andrew Keese, a commission spokesperson, said in a statement. During last February’s power crisis and winter storm,


gas-fueled generators were the largest source of unavailable capacity on Texas’ main power grid. And parts of the gas system were forced to shut down because of a lack of electricity. More


than 4 million homes and businesses lost power in Texas, many of them for days, and over 240 deaths were linked to the winter storm, according to a state tally. Damage has been estimated at


more than $100 billion. The Texas power grid survived a winter storm last week, but it was milder than the one that caused the blackouts in 2021 (Energywire, Feb. 4). The Railroad Commission


said in a Dec. 30 post that it had inspected 3,000 sites. In a newsletter posted Feb. 1, the agency increased that to 4,000. It said 98 percent had been “winterized,” although that was not


a question on the survey and the commission hasn’t set a standard for winterizing. Facilities in the remaining 2 percent, the agency reported, were in the process of completing the


“winterizing.” E&E News reviewed data on more than 3,600 inspections of wells, pipelines and storage fields, obtained through a public records request, though, and the records tell a


different story. Inspectors asked each facility’s operator whether it had applied to be listed as critical infrastructure, a designation that intended to protect facilities from blackouts.


Other questions included whether the facilities had tested their weather preparedness features and whether they had properly prepared for winter. Commission staff also visited sites and


inspected company records. Of 401 pipeline and storage facilities on the list, inspectors didn’t visit more than 30 in person because of “time constraints.” Inspectors looked at 264 pipeline


and storage facilities considered “critical gas infrastructure.” Asked whether their weatherization equipment was in good working order, nearly 20 percent of the facility operators answered


“no” or said they didn’t know. And 115 of the critical facilities — more than 40 percent — hadn’t tested their weather preparedness procedures or officials didn’t know if they had done such


a test. ‘WE AREN’T VERY CONFIDENT IN THE PROCESS’ Inspectors also looked at production sites, visiting nearly 3,300 gas leases. At about 40 percent, the weather preparedness procedures had


not been tested. Railroad Commission officials said in November that about 20,000 leases out of more than 130,000 statewide are “super critical” to maintaining the gas supply — but they


haven’t publicly identified them, and it’s not clear if the inspectors visited those leases or other, less-critical leases. That makes it difficult to tell if inspectors are looking at the


most vital wells, said Virginia Palacios, executive director of Commission Shift, a group pressing for change at the Railroad Commission. “They haven’t told us what they’re looking for,” she


said. “We aren’t very confident in the process.” There’s anecdotal evidence that the inspections haven’t guaranteed that gas will keep flowing. In December, inspectors visited pipelines


fueling the R.W. Miller natural gas-fired generation station west of Dallas. It was one of the power plants forced to shut down during the 2021 freeze because its gas supply was curtailed.


Five days after the visit, the agency issued a “favorable report” congratulating the company on “your efforts to maintain the pipeline facilities.” Last month, on Jan. 7, the Miller plant


lost gas service to three of its units when temperatures in the area plummeted to 17 degrees Fahrenheit. The Railroad Commission didn’t respond to questions about the Miller plant, and plant


owner Brazos Electric Power Cooperative didn’t respond to repeated phone messages. In other inspections, the commission either missed or failed to follow up on important information. The


commission’s inspectors spent four days auditing an Enterprise Product Partners LP pipeline that feeds an electric plant run by Denton Municipal Electric. The inspection records noted that


Enterprise has equipment to keep its line from freezing, and went on to say, “The operator reported having no issues with their transmission lines during Winter Storm Uri.” But the Railroad


Commission apparently never spoke to the people who run the power plant. If they had, they’d have known that the Denton plant was forced to shut down last year because its gas supply was cut


off. Some of the plant’s equipment froze, making it harder to restart the generators when fuel was restored, said Tony Puente, Denton Municipal Electric’s general manager. Enterprise, based


in Houston, declined to answer specific questions about the gas supply to the Denton plant, but said its operations are ready for winter. “Enterprise’s critical load-designated natural gas


facilities have all been winterized and are fully functional,” a company spokesman said in a statement. AWAITING WINTERIZATION RULES A similar situation unfolded when the Railroad Commission


checked the pipelines serving the gas-fired Midlothian power plant southwest of Dallas. Records from the state’s main power grid operator show that the plant lost some of its gas supply


during last year’s freeze, and the plant’s owner, Texas-based Vistra Corp., has been outspoken about problems with the state’s gas supply. Vistra CEO Curt Morgan led reporters on a tour of


the Midlothian site last fall (Energywire, Oct. 18, 2021). The Railroad Commission spoke to representatives of Tucker Energy Solutions, based outside Houston, which owns the pipelines


serving the plant. An employee at the site mentioned that the plant may have had gas supply problems, but when the inspector inquired further, the employee declined to answer questions and a


supervisor referred the inspector to Tucker’s legal department. “It would be fitting for further review of Tucker Energy Solutions’ pipelines,” the inspector wrote. The commission’s


headquarters staff later sent a letter to Tucker saying no violations had been found. The company didn’t respond to requests for comment. Keese, the spokesperson for the Railroad Commission,


said the agency has until Sept. 1 of this year to write its winterization regulations, and that it started doing inspections last fall to be proactive. “In addition to these site visits,


the RRC has talked with executives of large oil and gas companies and pipeline operations to ensure we are on top of making sure the state’s energy supply flows in freezing temperatures this


winter,” Keese said in a statement. Texas has seen several bouts of cold weather so far in 2022. While there have been sporadic problems with gas supplies, the state’s electric grid has


generally kept working. After the freeze last year, Texas Gov. Greg Abbott (R) replaced members of the state Public Utility Commission. The Texas Legislature passed laws to enact reforms.


The board of the Electricity Reliability Council of Texas, the state’s main power grid operator, was overhauled. While the Railroad Commission’s winterization rules aren’t expected to be


finished until later this year, the state agency has clarified which facilities should be designated as critical infrastructure, requiring them to work with electricity providers to prevent


power losses. At a Nov. 30 Railroad Commission meeting, Commissioner Jim Wright said the designation should apply to leases that produce large amounts of gas, along with pipelines and


storage facilities. It wasn’t clear from his comments how many wells and other pipelines fell in that category. Abbott and other state officials said the grid’s performance during the winter


storm last week shows the system is working. At the same time, the grid’s operators got a few lucky breaks compared with last winter — temperatures were about 20 degrees Fahrenheit warmer


in Dallas last week than in the previous year’s storm, and there was plenty of wind power to help provide electricity (Energywire, Feb. 4). Commission Shift’s Palacios and other critics said


they’re still concerned that the state’s gas producers aren’t ready for another severe storm, given the relatively slow speed of the Railroad Commission’s rule-writing process. “We might


not have rules even by next winter,” Palacios said.


Trending News

Seizures of animal products exported and imported illegally from and into the UK. - GOV.UK

FOI release Seizures of animal products exported and imported illegally from and into the UK. Seizures of animal species...

Giant Step Out of the Closet

Skip to main contentGet appSubscribeVideoPodcastLong FormSubscriber Only#FightToBreatheExplainersहिन्दीSubscribeNL SenaM...

Added Focus Will Be Political Issues : Moral Majority Absorbed by New Group

WASHINGTON — The Rev. Jerry Falwell, president of the Moral Majority since he founded it in 1979, said Friday that the c...

Lower-priced Xbox 360 already selling at Target?

Can’t wait for tomorrow when rumors of an expected Xbox 360 price drop are supposed to come true? Head on over to your l...

De boer hails 'important' victory for inter at pescara

Frank de Boer hailed an important victory as his Inter side won for the first time in Serie A this season at Pescara. Th...

Latests News

Documents show major gaps in texas gas inspections

Oil and gas regulators are assuring Texans the natural gas system will keep functioning this winter, saying they’ve done...

Woman who chopped off swami’s penis is under pressure from sangh parivar, says boyfriend

A few days ago, there was a shocking development in the case where a young law student from Thiruvananthapuram, Kerala c...

404 - Page Not Found W

Inext स्पेशल और पढ़ें > puja paath54 minutes ago Aaj Ka Panchang 12 June 2025: पढ़ें गुरुवार का संपूर्ण पंचांग, राहुकाल,...

This very short transatlantic flight will get you to london in about 5 hours this summer — but there’s a catch

In the time it typically takes to fly from Los Angeles to New York, travelers on this side of the Atlantic could be touc...

Man utd star fernandes ‘hasn’t really done anything since joining'

Manchester United star Bruno Fernandes has been criticised following the club’s goalless draw with Crystal Palace on Wed...

Top